Window & Door Distribution Center
Facility Type:
Window & Door Distribution Center
Project:
Reconfiguration of warehouse, Pallet Racking, Cantilever racking
Location:
Cranford, NJ
Fun Fact:
J&J was able to solve more than a dozen storage inefficiencies within one project.
Reimagined Design, Materials, Storage, and Installation Solutions
- Reconfigured layout of selective and cantilever rack.
- Replaced damaged racking components.
- Provided a Fire Safety Egress Plan.
- Over a dozen storage challenges creatively reconfigured in one project.

Project Quick Facts
Installation & Layout
- Racking
- Floor Angle
- Line Striping
- Multiple Safety Products
- Installed M & Z Style dividers
- Fabricated storage racks

Challenges
- Limited installation timeframe
- Working within space constraints to creatively maximize storage efficiency

Our Approach
J&J collaborated with the customer to reconfigure their entire warehouse to maximize storage efficiency. J&J, along with our CAD Designer, Corey Pierce worked with the client to reconfigure their layout while also providing a Fire Egress Plan for their site. The team also assisted the client with sorting and stocking product.
Products Used:
- J&J Material – New and Pre-Owned Pallet Racking
- Cantilever Racking
- End of Aisle Protection
- Safety Products

Outcome
J&J creatively expanded the storage space within a limited footprint and paid immense attention to detail in sorting and providing product storage suggestions. The client was so pleased with the outcome that they entrusted J&J with six additional future project opportunities.